Laybarge LB200 for Stolt Offshore

A good recent example of the possibilities of the Van of the Well Group is the modification of 4 cranes carried out onboard the LB200. The production of the required parts was carried out by Van Der Wel Machinery & Construction. There was only 6 weeks available in which to complete this project with a total of 2500 man hours required by the machining and construction departments to complete their tasks.

The disassembling of the old parts and reassembly of the replacement parts was carried out by van Der Wel Montage. A total of 4000 hours was required by Van Der Wel Montage to complete the project.
The short space of time available in which to complete this project shows the importance of being able to keep everything in house when needing to deliver on the agreed date.
This entire project was carried out to the total satisfaction of the customer
Due to the good mutual agreements which the three companies have between each other, the whole group is able to integrate together in many different types of industry.

Our target groups:

  • Offshore
  • Dredging industry
  • Machine shops
  • (petro) Chemical industry
  • Crane businesses
  • Engineering
  • Heavy industry
  • Aerospace industry
© Van der Wel Group.  |  Terms and conditions  |  Webdesign MediaMonks BV